Kohler Ladena Rectangle Undermount Bathroom Sink

$3.50

Product Number(s): K-2214-G, K-2214, K-2215

Kohler – Ladena Rectangle Undermount Bathroom Sink

Create highly detailed and accurate drawings in AutoCAD while saving time with this easy to use dynamic block.  The block includes drawn to scale plan, elevation, and profile views allowing you switch between them with just one click. Additionally all standard rod lengths are built in so there’s no more guessing. Note the instructions tab on each block offers quick use suggestions right in model space.

Support and Updates: We strive to provide accurate AutoCAD blocks and offer support for any technical issues with the files. Ongoing updates or revisions are not included. Retail products are subject to change and may be modified or discontinued by the retail company. Our AutoCAD blocks include a “draw date" indicating when the block was made. Before recommending the item as a purchasing option, please ensure that it is still available.

Product Number(s): K-2214-G, K-2214, K-2215

Kohler – Ladena Rectangle Undermount Bathroom Sink

Create highly detailed and accurate drawings in AutoCAD while saving time with this easy to use dynamic block.  The block includes drawn to scale plan, elevation, and profile views allowing you switch between them with just one click. Additionally all standard rod lengths are built in so there’s no more guessing. Note the instructions tab on each block offers quick use suggestions right in model space.

Support and Updates: We strive to provide accurate AutoCAD blocks and offer support for any technical issues with the files. Ongoing updates or revisions are not included. Retail products are subject to change and may be modified or discontinued by the retail company. Our AutoCAD blocks include a “draw date" indicating when the block was made. Before recommending the item as a purchasing option, please ensure that it is still available.

Digital Items Policy

Licensing: When you purchase our blocks, you are granted a non-exclusive, non-transferable license to use the blocks in your designs. This license is valid for personal and professional use only and does not permit the resale or redistribution of the blocks. Intellectual Property Rights: The AutoCAD blocks are protected by copyright and other intellectual property laws. The ownership and intellectual property rights of the blocks remain with Nina Silver Drafting and Design. Non-refundable: Due to the nature of digital products, all sales of AutoCAD blocks are final and non-refundable. Please ensure that the blocks meet your requirements and are compatible with your software. Usage Limitations: The purchased AutoCAD blocks are intended for use within your own projects. They should not be used in a manner that infringes upon the rights of the original creator or for purposes that violate applicable laws or regulations. Unauthorized Distribution: Redistribution, sharing, or selling of the purchased AutoCAD blocks to third parties is strictly prohibited. This includes sharing the blocks on public platforms, websites, or file-sharing networks. Modifications: You are permitted to modify the AutoCAD blocks to suit your specific project needs. However, these modifications should not be used to create derivative works for resale or redistribution. By purchasing and downloading our AutoCAD blocks, you agree to comply with this digital item policy. Any violation of this policy may result in legal action for infringement of intellectual property rights. If you have any questions or require clarification regarding this policy, please reach out to our team for assistance.